Through finding, the anchor bolting process is a dynamic state to be forced, and got the variety law of anchor be forced and lateral displacement of the foundation pit.
通过研究发现,锚杆的受力是一个动态受力过程,并且得出了锚杆受力和基坑壁侧向位移的变化规律。
The relationships from vertical soil pressure, axial stress of anchor, lateral displacement of foundation to construction process are got by test data analysis.
通过对试验数据的分析得出了土中竖向应力、锚杆轴向应力、基坑侧向位移与施工过程间的变化关系。
This paper introduces the artificial grouting construction process, the slurry infusion simulation and anti-floating anchor node waterproof treatment according to an engineering case.
结合工程实例介绍了人工注浆法的施工工艺、灌注浆的模拟试验及抗浮锚杆的节点防水处理措施。
应用推荐